Hilton Hotel

Project Sheet
Executive Summary

Construction of a new 5 star Hilton Standard Hotel, consisting of 10 stories and a multiple basement parking arrangement.

WCE was responsible for all engineering disciplines, i.e. bulk earthworks, structural design, electrical infrastructure, mechanical design, storm water, water and sewer reticulation. Preparation of Engineering Designs, Drawings and Tender Documentation. Quality Control was exercised in terms of General Conditions of Contract and SABS 1200 Specifications. Duties also included Contract Administration and Site Supervision.

Project Information

Client

Pride of Africa Hospitality (Ltd) Pty
P O Box 40194
Windhoek
Namibia

Mr. Phillip Youngh
Tel: (+264) 61 277 800
Email: Phillip@united.com.na

Project Data

Start Date
September 2007
Completion Date
2011

Contract Value
N$180 Million

Project Location
Windhoek, Namibia

Project Team

Project Engineer
D vd Merwe
Civil Engineer
D.J. du Toit
H. Fleidl
Mechanical Engineer
K. Kelestura
Electrical Engineer
D Maxwell
Technician
C. Katjazengi
Contractor
New Era